STORM WATER DRAINAGE SYSTEM, NORTHERN CORRIDOR BUFFER ZONE, JUBAIL

Completed Projects

STORM WATER DRAINAGE SYSTEM, NORTHERN CORRIDOR BUFFER ZONE, JUBAIL

  • Client : Royal Commission for Jubail
  • Type of Service : Design and Engineering
  • Commencement Date : August 2016
  • Completion Date : January 2017
Study and evaluate of the existing storm water collection and disposal system plus proposals for expansion and development to meet future requirements including the channels, pipes, pump stations and storage ponds.
Based on the existing master plan land use and the outfall discharge point the proposed future storm drainage system to cope with the future development was designed including the new storm water collection system, channels, pipes and outfalls all designed to in coordination with the proposed site grading and roads profiles .
A detailed analysis and hydraulic model and simulation were prepared to determine the hydraulic parameters and sizes of the storm water elements of channels and pipes.
The updated the master plan layout of the expanded storm water drainage system was then finalised.