INFRASTRUCTURE FOR WATERFRONT PHASE 2 COMMUNITY AREA, YANBU

Completed Projects

INFRASTRUCTURE FOR WATERFRONT PHASE 2 COMMUNITY AREA, YANBU

  • Client : Royal Commission for Yanbu
  • Type of Service : Design and Detailed Engineering / Infrastructure, Utilities
  • Commencement Date : November 2018
  • Completion Date : December 2019

The work of this contract includes the site development of investors opportunities and public facilities located in Phase-2 of waterfront Development in accordance with the contract drawings and documents. The scope of work was to redesign the Electrical and Telecom by fulfilling the latest requirements of Marafiq and RC smart City. The design of buildings, Landscape and Civil shall be reviewed and amended as required.
Site Area: 100 Hectares
Service provided in the detailed design:
• Review Architectural design of buildings.
• Review Structural Design
• Review Landscape design.
• Review Civil Infrastructure
• Review Roads and Grading
• Review Wet Services
• Stormwater
• Review TSE Irrigation Network
• Review and modify Mechanical
• Re-design Electrical system
• Redesign Telecommunication, safety and security system
• Fiber Optic network design for FTTX
• Fiber optic ISP and OSP design
• Incorporate Smart City requirements