INDUSTRIAL CITY RIYADH 3 – DESIGN OF WATER SUPPLY PIPELINE CONNECTION

Completed Projects

INDUSTRIAL CITY RIYADH 3 – DESIGN OF WATER SUPPLY PIPELINE CONNECTION

  • Client : Saudi Authority for Industrial Cities And Technology Zones – MODON
  • Type of Service : Consultancy Design Services
  • Commencement Date : May 2019
  • Completion Date : December 2019

Feasibility study and detailed design of 200mm diameter water supply pipeline of approx. 2km length from National Water Company (NWC) main distribution pipeline to the MODON Industrial City 3, Riyadh storage tank.  The design included the route selection, pipeline layout, horizontal and vertical alignment, thrust blocks design, valve chambers and instrumentation.   The route selection included the preliminary design of a new upgraded access roadway to the Industrial City 3, Riyadh.  Approvals of Riyadh Municipality, National Water Company and Ministry of Interior were obtained for the new pipeline.