Due to the increase in demand for better infrastructure, the university decided to expand the existing facility with a new building of total built-up area around 13,000m². The design of the new building was coordinated with the university projects department.
The design included a state-of-the-art laboratory facility as an extension of engineering college. This facility is linked with the existing College of Science and College of Engineering through bridges at upper levels.