To Study and provide engineering solutions of the existing smoke extraction system of the hospital of Royal Commission Atriums with minimum changes in the ongoing construction.
The Fire zoning was studied as per IBC 2012 and NFPA.
Services provided in the detailed design for:
• Architectural modifications
• HVAC modifications
• Fire Fighting
• Electrical modifications
• Telecom modifications
• CFD Analysis