Engineering services to develop a design package to facilitate construction contractor to divert an existing pipeline during a planned shutdown of the Obaikan Glass Company and to relocate the pipeline at the suitable above ground locations at two entrances.
This project involved the following:
• Stress Analysis
• HAZOP Study
• The project has been performed in collaboration with sub consultant DAR Engineering Consulting