Evaluation of the existing sanitary waste water system including the main lift station and force main and development and modeling of the system to accommodate the planned development.
The sanitary waste water demand volumes and flows based on the new and updated master plan land use were assessed. The waste water system master layout plan was then updated to include the proposed location of the new required main lift station and force main, together with recommendations for upgrade of the existing lift station and rising force main. The hydraulic model for the expanded system was prepared, and the system optimized and reported. The updated road and utility cross sections were also prepared.